| Task ID | Task Name | Resource Name | Work | Start | Finish | % Work Complete |
| 4 | Establish the PM Environment | Program Manager | 0 hrs | Mon 6/22/98 | Mon 6/22/98 | 0% |
| 4 | Establish the PM Environment | Project Manager | 0 hrs | Mon 6/22/98 | Mon 6/22/98 | 0% |
| 4 | Establish the PM Environment | Client Sponsor | 0 hrs | Mon 6/22/98 | Mon 6/22/98 | 0% |
| 4 | Establish the PM Environment | Keane Doc Specialist | 0 hrs | Mon 6/22/98 | Mon 6/22/98 | 0% |
| 4 | Establish the PM Environment | Keane Engagement Manager | 0 hrs | Mon 6/22/98 | Mon 6/22/98 | 0% |
| 5 | Manage the Engagement | Keane Engagement Manager | 0 hrs | Mon 6/22/98 | Mon 6/22/98 | 0% |
| 6 | Establish and Perform Quality Assurance Process | Keane QA Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 7 | Tools and Repository Management | Repository Administrator | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 9 | Determine Engagement Objectives and Scope | Keane Doc Specialist | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 9 | Determine Engagement Objectives and Scope | Client Sponsor | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 9 | Determine Engagement Objectives and Scope | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 10 | Develop Approach | Keane Doc Specialist | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 10 | Develop Approach | Client Sponsor | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 10 | Develop Approach | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 11 | Identify Participants and Roles | Keane Doc Specialist | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 11 | Identify Participants and Roles | Client Sponsor | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 11 | Identify Participants and Roles | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 12 | Develop Formal Engagement Plan | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 13 | Build Common Vision and Committment | Client Sponsor | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 13 | Build Common Vision and Committment | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 15 | Identify Projects | Keane Doc Specialist | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 15 | Identify Projects | Client Sponsor | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 15 | Identify Projects | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 16 | Identify Stakeholders | Keane Doc Specialist | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 16 | Identify Stakeholders | Client Sponsor | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 16 | Identify Stakeholders | Client Program Stakeholders | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 16 | Identify Stakeholders | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 17 | Identify Candidate Program Sponsor | Client Sponsor | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 17 | Identify Candidate Program Sponsor | Client Program Stakeholders | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 17 | Identify Candidate Program Sponsor | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 18 | Identify Candidate Program Manager | Client Sponsor | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 18 | Identify Candidate Program Manager | Client Program Stakeholders | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 18 | Identify Candidate Program Manager | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 19 | Identify Third Party Participants | Keane Doc Specialist | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 19 | Identify Third Party Participants | Repository Administrator | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 19 | Identify Third Party Participants | Client Sponsor | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 19 | Identify Third Party Participants | Client Program Stakeholders | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 19 | Identify Third Party Participants | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 21 | Interview Stakeholders | Client Program Stakeholders | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 21 | Interview Stakeholders | Keane Doc Specialist | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 21 | Interview Stakeholders | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 22 | Analyze Project Characteristics | Client Sponsor | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 22 | Analyze Project Characteristics | Keane Doc Specialist | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 22 | Analyze Project Characteristics | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 23 | Assess Project Personnel | Client Program Stakeholders | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 23 | Assess Project Personnel | Client Sponsor | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 23 | Assess Project Personnel | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 25 | Identify Program Risk Factors | Client Sponsor | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 25 | Identify Program Risk Factors | Keane Doc Specialist | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 25 | Identify Program Risk Factors | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 26 | Assess Program Risks | Keane Doc Specialist | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 26 | Assess Program Risks | Client Sponsor | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 26 | Assess Program Risks | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 27 | Develop Mitigation Strategies | Client Sponsor | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 27 | Develop Mitigation Strategies | Keane Doc Specialist | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 27 | Develop Mitigation Strategies | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 28 | Develop Program Risk Profile | Keane Doc Specialist | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 28 | Develop Program Risk Profile | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 30 | Define Program Needs | Keane Doc Specialist | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 30 | Define Program Needs | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 30 | Define Program Needs | Client Sponsor | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 31 | Define Program Benefits | Keane Doc Specialist | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 31 | Define Program Benefits | Client Sponsor | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 31 | Define Program Benefits | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 32 | Define Proposed PMO Model | Client Sponsor | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 32 | Define Proposed PMO Model | Keane Doc Specialist | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 32 | Define Proposed PMO Model | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 33 | Define Program Management Skills and Competencies | Client Sponsor | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 33 | Define Program Management Skills and Competencies | Keane Doc Specialist | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 33 | Define Program Management Skills and Competencies | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 34 | Define Proposed Next Steps | Keane Doc Specialist | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 34 | Define Proposed Next Steps | Client Sponsor | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 34 | Define Proposed Next Steps | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 35 | Document Assessment Findings | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 35 | Document Assessment Findings | Keane Doc Specialist | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 37 | Present Recommended Approach | Client Sponsor | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 37 | Present Recommended Approach | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 38 | Revise Recommendation if Necessary | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 38 | Revise Recommendation if Necessary | Keane Doc Specialist | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 39 | Gain Approval | Exec. Steering Committee | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 39 | Gain Approval | Client Sponsor | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 39 | Gain Approval | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 42 | Establish the PM Environment | Program Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 42 | Establish the PM Environment | Project Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 42 | Establish the PM Environment | Client Sponsor | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 42 | Establish the PM Environment | Keane Doc Specialist | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 42 | Establish the PM Environment | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 43 | Manage the Engagement | Keane Engagement Manager | 0 hrs | Fri 6/19/98 | Fri 6/19/98 | 0% |
| 44 | Establish and Perform Quality Assurance Process | Keane QA Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 45 | Tools and Repository Management | Keane Repository Admin | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 47 | Determine Engagement Objectives and Scope | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 47 | Determine Engagement Objectives and Scope | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 47 | Determine Engagement Objectives and Scope | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 48 | Develop the Engagement Approach | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 48 | Develop the Engagement Approach | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 48 | Develop the Engagement Approach | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 49 | Identify Participants and Roles | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 49 | Identify Participants and Roles | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 49 | Identify Participants and Roles | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 50 | Identify Infrastructure Requirements | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 50 | Identify Infrastructure Requirements | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 51 | Develop Formal Engagement Plan | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 52 | Finalize PMO Budget | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 52 | Finalize PMO Budget | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 53 | Obtain Approval | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 53 | Obtain Approval | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 54 | Build Common Vision and Committment | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 54 | Build Common Vision and Committment | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 56 | Review PMO Needs Assessment | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 56 | Review PMO Needs Assessment | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 57 | Review PM Competency Model | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 57 | Review PM Competency Model | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 58 | Identify Lead PMO Team Roles | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 58 | Identify Lead PMO Team Roles | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 58 | Identify Lead PMO Team Roles | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 58 | Identify Lead PMO Team Roles | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 59 | Identify PMO Team Member Candidates | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 59 | Identify PMO Team Member Candidates | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 59 | Identify PMO Team Member Candidates | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 59 | Identify PMO Team Member Candidates | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 60 | Assess PMO Team Member Candidates | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 60 | Assess PMO Team Member Candidates | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 60 | Assess PMO Team Member Candidates | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 60 | Assess PMO Team Member Candidates | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 61 | Select Lead PMO Team Members | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 61 | Select Lead PMO Team Members | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 61 | Select Lead PMO Team Members | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 62 | Initiate Lead PMO Team Members | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 62 | Initiate Lead PMO Team Members | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 62 | Initiate Lead PMO Team Members | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 62 | Initiate Lead PMO Team Members | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 63 | Conduct PMO Kickoff Meetings | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 63 | Conduct PMO Kickoff Meetings | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 65 | Establish Administrative Roles | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 65 | Establish Administrative Roles | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 65 | Establish Administrative Roles | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 65 | Establish Administrative Roles | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 65 | Establish Administrative Roles | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 65 | Establish Administrative Roles | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 66 | Establish Record Keeping Roles | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 66 | Establish Record Keeping Roles | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 66 | Establish Record Keeping Roles | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 66 | Establish Record Keeping Roles | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 66 | Establish Record Keeping Roles | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 66 | Establish Record Keeping Roles | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 67 | Assign Responsibilities | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 67 | Assign Responsibilities | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 67 | Assign Responsibilities | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 67 | Assign Responsibilities | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 67 | Assign Responsibilities | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 68 | Initiate the Housekeeping Process | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 68 | Initiate the Housekeeping Process | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 68 | Initiate the Housekeeping Process | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 68 | Initiate the Housekeeping Process | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 68 | Initiate the Housekeeping Process | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 70 | Review PMO Needs Assessment | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 70 | Review PMO Needs Assessment | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 70 | Review PMO Needs Assessment | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 70 | Review PMO Needs Assessment | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 70 | Review PMO Needs Assessment | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 70 | Review PMO Needs Assessment | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 70 | Review PMO Needs Assessment | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 70 | Review PMO Needs Assessment | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 71 | Conduct Additional Research If Necessary | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 71 | Conduct Additional Research If Necessary | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 71 | Conduct Additional Research If Necessary | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 72 | Define the PMO Mission Statement | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 72 | Define the PMO Mission Statement | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 72 | Define the PMO Mission Statement | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 72 | Define the PMO Mission Statement | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 72 | Define the PMO Mission Statement | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 72 | Define the PMO Mission Statement | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 72 | Define the PMO Mission Statement | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 72 | Define the PMO Mission Statement | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 73 | Define the PMO Objectives | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 73 | Define the PMO Objectives | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 73 | Define the PMO Objectives | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 73 | Define the PMO Objectives | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 73 | Define the PMO Objectives | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 73 | Define the PMO Objectives | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 73 | Define the PMO Objectives | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 74 | Define the PMO Critical Success Factors | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 74 | Define the PMO Critical Success Factors | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 74 | Define the PMO Critical Success Factors | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 74 | Define the PMO Critical Success Factors | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 74 | Define the PMO Critical Success Factors | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 75 | Define the PMO Metrics and Strategies | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 75 | Define the PMO Metrics and Strategies | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 75 | Define the PMO Metrics and Strategies | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 75 | Define the PMO Metrics and Strategies | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 75 | Define the PMO Metrics and Strategies | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 75 | Define the PMO Metrics and Strategies | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 75 | Define the PMO Metrics and Strategies | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 76 | Define Sub-Project Roles and Objectives | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 76 | Define Sub-Project Roles and Objectives | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 76 | Define Sub-Project Roles and Objectives | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 76 | Define Sub-Project Roles and Objectives | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 76 | Define Sub-Project Roles and Objectives | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 76 | Define Sub-Project Roles and Objectives | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 76 | Define Sub-Project Roles and Objectives | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 77 | Define Third Party Roles and Objectives | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 77 | Define Third Party Roles and Objectives | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 77 | Define Third Party Roles and Objectives | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 77 | Define Third Party Roles and Objectives | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 77 | Define Third Party Roles and Objectives | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 77 | Define Third Party Roles and Objectives | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 77 | Define Third Party Roles and Objectives | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 78 | Update PMO Structural Model | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 78 | Update PMO Structural Model | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 79 | Obtain Approval and Committment | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 79 | Obtain Approval and Committment | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 79 | Obtain Approval and Committment | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 79 | Obtain Approval and Committment | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 79 | Obtain Approval and Committment | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 79 | Obtain Approval and Committment | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 79 | Obtain Approval and Committment | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 80 | Publish the PMO Charter | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 80 | Publish the PMO Charter | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 80 | Publish the PMO Charter | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 80 | Publish the PMO Charter | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 80 | Publish the PMO Charter | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 80 | Publish the PMO Charter | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 80 | Publish the PMO Charter | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 80 | Publish the PMO Charter | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 82 | Review PMO Needs Assessment | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 82 | Review PMO Needs Assessment | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 82 | Review PMO Needs Assessment | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 82 | Review PMO Needs Assessment | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 82 | Review PMO Needs Assessment | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 82 | Review PMO Needs Assessment | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 82 | Review PMO Needs Assessment | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 82 | Review PMO Needs Assessment | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 83 | Conduct Additional Research If Necessary | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 83 | Conduct Additional Research If Necessary | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 83 | Conduct Additional Research If Necessary | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 84 | Define the PMO Information Requirements | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 84 | Define the PMO Information Requirements | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 84 | Define the PMO Information Requirements | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 84 | Define the PMO Information Requirements | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 84 | Define the PMO Information Requirements | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 84 | Define the PMO Information Requirements | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 84 | Define the PMO Information Requirements | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 84 | Define the PMO Information Requirements | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 85 | Define the PMO Information Model | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 85 | Define the PMO Information Model | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 85 | Define the PMO Information Model | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 85 | Define the PMO Information Model | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 85 | Define the PMO Information Model | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 85 | Define the PMO Information Model | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 85 | Define the PMO Information Model | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 85 | Define the PMO Information Model | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 86 | Obtain Approval and Committment | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 86 | Obtain Approval and Committment | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 86 | Obtain Approval and Committment | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 86 | Obtain Approval and Committment | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 86 | Obtain Approval and Committment | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 86 | Obtain Approval and Committment | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 86 | Obtain Approval and Committment | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 86 | Obtain Approval and Committment | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 87 | Publish the PMO Information Model | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 87 | Publish the PMO Information Model | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 87 | Publish the PMO Information Model | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 87 | Publish the PMO Information Model | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 87 | Publish the PMO Information Model | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 87 | Publish the PMO Information Model | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 87 | Publish the PMO Information Model | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 87 | Publish the PMO Information Model | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 89 | Review PMO Needs Assessment | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 89 | Review PMO Needs Assessment | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 89 | Review PMO Needs Assessment | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 89 | Review PMO Needs Assessment | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 89 | Review PMO Needs Assessment | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 89 | Review PMO Needs Assessment | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 89 | Review PMO Needs Assessment | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 89 | Review PMO Needs Assessment | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 90 | Conduct Additional Research If Necessary | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 90 | Conduct Additional Research If Necessary | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 90 | Conduct Additional Research If Necessary | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 91 | Define Procedures for Major Functions | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 91 | Define Procedures for Major Functions | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 91 | Define Procedures for Major Functions | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 91 | Define Procedures for Major Functions | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 91 | Define Procedures for Major Functions | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 91 | Define Procedures for Major Functions | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 91 | Define Procedures for Major Functions | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 91 | Define Procedures for Major Functions | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 92 | Define Metrics for Major Functions | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 92 | Define Metrics for Major Functions | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 92 | Define Metrics for Major Functions | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 92 | Define Metrics for Major Functions | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 92 | Define Metrics for Major Functions | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 92 | Define Metrics for Major Functions | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 92 | Define Metrics for Major Functions | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 92 | Define Metrics for Major Functions | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 93 | Obtain Approval and Committment | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 93 | Obtain Approval and Committment | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 93 | Obtain Approval and Committment | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 93 | Obtain Approval and Committment | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 93 | Obtain Approval and Committment | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 93 | Obtain Approval and Committment | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 93 | Obtain Approval and Committment | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 94 | Publish PMO Procedures and Metrics | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 94 | Publish PMO Procedures and Metrics | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 94 | Publish PMO Procedures and Metrics | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 94 | Publish PMO Procedures and Metrics | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 94 | Publish PMO Procedures and Metrics | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 94 | Publish PMO Procedures and Metrics | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 94 | Publish PMO Procedures and Metrics | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 94 | Publish PMO Procedures and Metrics | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 96 | Identify PMO Functional Team Roles | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 96 | Identify PMO Functional Team Roles | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 96 | Identify PMO Functional Team Roles | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 96 | Identify PMO Functional Team Roles | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 96 | Identify PMO Functional Team Roles | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 96 | Identify PMO Functional Team Roles | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 96 | Identify PMO Functional Team Roles | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 96 | Identify PMO Functional Team Roles | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 97 | Identify PMO Functional Team Member Candidates | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 97 | Identify PMO Functional Team Member Candidates | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 97 | Identify PMO Functional Team Member Candidates | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 97 | Identify PMO Functional Team Member Candidates | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 97 | Identify PMO Functional Team Member Candidates | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 97 | Identify PMO Functional Team Member Candidates | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 97 | Identify PMO Functional Team Member Candidates | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 97 | Identify PMO Functional Team Member Candidates | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 98 | Assess PMO Functional Team Member Candidates | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 98 | Assess PMO Functional Team Member Candidates | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 98 | Assess PMO Functional Team Member Candidates | PMO Team Members | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 98 | Assess PMO Functional Team Member Candidates | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 98 | Assess PMO Functional Team Member Candidates | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 99 | Select Functional PMO Team Members | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 99 | Select Functional PMO Team Members | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 99 | Select Functional PMO Team Members | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 99 | Select Functional PMO Team Members | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 100 | Initiate PMO Functional Team Members | PMO Team Members | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 100 | Initiate PMO Functional Team Members | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 100 | Initiate PMO Functional Team Members | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 100 | Initiate PMO Functional Team Members | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 100 | Initiate PMO Functional Team Members | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 100 | Initiate PMO Functional Team Members | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 100 | Initiate PMO Functional Team Members | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 100 | Initiate PMO Functional Team Members | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 100 | Initiate PMO Functional Team Members | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 102 | Review PMO Charter and Plans | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 102 | Review PMO Charter and Plans | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 102 | Review PMO Charter and Plans | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 102 | Review PMO Charter and Plans | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 102 | Review PMO Charter and Plans | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 102 | Review PMO Charter and Plans | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 102 | Review PMO Charter and Plans | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 102 | Review PMO Charter and Plans | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 103 | Identify the Facilities Requirements | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 103 | Identify the Facilities Requirements | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 103 | Identify the Facilities Requirements | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 103 | Identify the Facilities Requirements | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 103 | Identify the Facilities Requirements | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 104 | Develop Facilities Plan | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 104 | Develop Facilities Plan | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 104 | Develop Facilities Plan | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 104 | Develop Facilities Plan | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 104 | Develop Facilities Plan | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 105 | Obtain Approval and Committment | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 105 | Obtain Approval and Committment | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 105 | Obtain Approval and Committment | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 105 | Obtain Approval and Committment | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 105 | Obtain Approval and Committment | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 105 | Obtain Approval and Committment | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 105 | Obtain Approval and Committment | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 106 | Acquire the Facilities | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 106 | Acquire the Facilities | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 106 | Acquire the Facilities | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 106 | Acquire the Facilities | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 107 | Allocate the Facilities | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 107 | Allocate the Facilities | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 107 | Allocate the Facilities | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 108 | Prepare the Facilities | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 108 | Prepare the Facilities | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 109 | Occupy the Facilities | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 109 | Occupy the Facilities | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 110 | Manage the Facilities | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 112 | Review PMO Charter and Plans | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 112 | Review PMO Charter and Plans | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 112 | Review PMO Charter and Plans | Repository Administrator | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 112 | Review PMO Charter and Plans | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 112 | Review PMO Charter and Plans | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 112 | Review PMO Charter and Plans | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 112 | Review PMO Charter and Plans | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 112 | Review PMO Charter and Plans | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 112 | Review PMO Charter and Plans | WWW Developer | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 112 | Review PMO Charter and Plans | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 113 | Identify the PMO Tools Requirements | WWW Developer | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 113 | Identify the PMO Tools Requirements | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 113 | Identify the PMO Tools Requirements | Repository Administrator | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 113 | Identify the PMO Tools Requirements | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 113 | Identify the PMO Tools Requirements | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 113 | Identify the PMO Tools Requirements | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 114 | Select and Acquire PMO Tools | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 114 | Select and Acquire PMO Tools | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 114 | Select and Acquire PMO Tools | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 114 | Select and Acquire PMO Tools | Repository Administrator | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 114 | Select and Acquire PMO Tools | WWW Developer | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 114 | Select and Acquire PMO Tools | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 114 | Select and Acquire PMO Tools | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 115 | Install PMO Tools | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 115 | Install PMO Tools | WWW Developer | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 115 | Install PMO Tools | Repository Administrator | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 116 | Establish the PMO Repository | Repository Administrator | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 116 | Establish the PMO Repository | WWW Developer | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 118 | Review PMO Charter and Plans | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 118 | Review PMO Charter and Plans | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 118 | Review PMO Charter and Plans | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 118 | Review PMO Charter and Plans | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 118 | Review PMO Charter and Plans | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 118 | Review PMO Charter and Plans | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 118 | Review PMO Charter and Plans | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 118 | Review PMO Charter and Plans | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 119 | Identify Training Requirements | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 119 | Identify Training Requirements | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 119 | Identify Training Requirements | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 120 | Develop Training Plan | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 120 | Develop Training Plan | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 120 | Develop Training Plan | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 121 | Schedule Training | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 122 | Execute the Training Plan | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 122 | Execute the Training Plan | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 124 | Assign a Functional Manager | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 124 | Assign a Functional Manager | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 124 | Assign a Functional Manager | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 124 | Assign a Functional Manager | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 124 | Assign a Functional Manager | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 124 | Assign a Functional Manager | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 125 | Assign Team Members as Appropriate | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 125 | Assign Team Members as Appropriate | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 125 | Assign Team Members as Appropriate | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 126 | Complete a Review of PMO Charter and Plans | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 126 | Complete a Review of PMO Charter and Plans | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 126 | Complete a Review of PMO Charter and Plans | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 126 | Complete a Review of PMO Charter and Plans | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 126 | Complete a Review of PMO Charter and Plans | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 126 | Complete a Review of PMO Charter and Plans | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 126 | Complete a Review of PMO Charter and Plans | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 126 | Complete a Review of PMO Charter and Plans | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 127 | Establish an Approved Plan and Budget | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 127 | Establish an Approved Plan and Budget | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 127 | Establish an Approved Plan and Budget | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 127 | Establish an Approved Plan and Budget | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 127 | Establish an Approved Plan and Budget | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 127 | Establish an Approved Plan and Budget | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 127 | Establish an Approved Plan and Budget | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 127 | Establish an Approved Plan and Budget | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 128 | Create a Written Definition of Roles and Responsbilities | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 128 | Create a Written Definition of Roles and Responsbilities | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 128 | Create a Written Definition of Roles and Responsbilities | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 128 | Create a Written Definition of Roles and Responsbilities | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 129 | Create a Written Definition of Appropriate Procedures | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 129 | Create a Written Definition of Appropriate Procedures | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 129 | Create a Written Definition of Appropriate Procedures | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 129 | Create a Written Definition of Appropriate Procedures | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 130 | Complete Required Training | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 130 | Complete Required Training | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 132 | Complete a Review of PMO Charter and Plans | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 132 | Complete a Review of PMO Charter and Plans | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 132 | Complete a Review of PMO Charter and Plans | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 132 | Complete a Review of PMO Charter and Plans | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 132 | Complete a Review of PMO Charter and Plans | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 132 | Complete a Review of PMO Charter and Plans | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 132 | Complete a Review of PMO Charter and Plans | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 132 | Complete a Review of PMO Charter and Plans | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 133 | Define Quality Performance Model | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 133 | Define Quality Performance Model | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 133 | Define Quality Performance Model | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 133 | Define Quality Performance Model | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 133 | Define Quality Performance Model | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 133 | Define Quality Performance Model | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 133 | Define Quality Performance Model | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 133 | Define Quality Performance Model | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 134 | Validate the Quality Performance Model | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 134 | Validate the Quality Performance Model | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 134 | Validate the Quality Performance Model | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 135 | Develop a Quality Performance Plan | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 135 | Develop a Quality Performance Plan | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 135 | Develop a Quality Performance Plan | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 136 | Communicate the Quality Performance Plan | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 136 | Communicate the Quality Performance Plan | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 136 | Communicate the Quality Performance Plan | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 136 | Communicate the Quality Performance Plan | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 136 | Communicate the Quality Performance Plan | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 136 | Communicate the Quality Performance Plan | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 136 | Communicate the Quality Performance Plan | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 136 | Communicate the Quality Performance Plan | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 137 | Execute the Quality Performance Plan | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 137 | Execute the Quality Performance Plan | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 137 | Execute the Quality Performance Plan | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 138 | Review and Revised the Quality Performance Plan | Lead PMO Team | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 138 | Review and Revised the Quality Performance Plan | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 138 | Review and Revised the Quality Performance Plan | Exec. Steering Committee | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 138 | Review and Revised the Quality Performance Plan | Client Program Stakeholders | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 138 | Review and Revised the Quality Performance Plan | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 138 | Review and Revised the Quality Performance Plan | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 138 | Review and Revised the Quality Performance Plan | Functional Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 138 | Review and Revised the Quality Performance Plan | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 141 | Establish the PM Environment | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 141 | Establish the PM Environment | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 141 | Establish the PM Environment | Project Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 141 | Establish the PM Environment | Client Sponsor | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 141 | Establish the PM Environment | Keane Doc Specialist | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 142 | Manage the Engagement | Program Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 142 | Manage the Engagement | Keane Engagement Manager | 0 hrs | Thu 6/18/98 | Thu 6/18/98 | 0% |
| 143 | Establish and Perform Quality Assurance Process | Keane QA Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 144 | Tools and Repository Management | Repository Administrator | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 146 | Perform Administrative Roles | Keane Doc Specialist | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 146 | Perform Administrative Roles | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 146 | Perform Administrative Roles | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 146 | Perform Administrative Roles | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 147 | Perform Record Keeping Roles | Keane Doc Specialist | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 147 | Perform Record Keeping Roles | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 147 | Perform Record Keeping Roles | Lead PMO Team | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 147 | Perform Record Keeping Roles | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 147 | Perform Record Keeping Roles | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 147 | Perform Record Keeping Roles | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 148 | Maintain the Repository | Repository Administrator | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 150 | Manage Program Budget Process | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 150 | Manage Program Budget Process | Exec. Steering Committee | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 150 | Manage Program Budget Process | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 150 | Manage Program Budget Process | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 150 | Manage Program Budget Process | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 151 | Roll Up Sub-Project Financial and Performance Measures | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 151 | Roll Up Sub-Project Financial and Performance Measures | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 151 | Roll Up Sub-Project Financial and Performance Measures | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 152 | Monitor Program Financial and Performance Measures | Exec. Steering Committee | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 152 | Monitor Program Financial and Performance Measures | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 152 | Monitor Program Financial and Performance Measures | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 152 | Monitor Program Financial and Performance Measures | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 153 | Report Program Financial and Performance Results | Third Party Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 153 | Report Program Financial and Performance Results | Client Program Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 153 | Report Program Financial and Performance Results | Exec. Steering Committee | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 153 | Report Program Financial and Performance Results | Keane Branch Mgmt Team | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 153 | Report Program Financial and Performance Results | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 153 | Report Program Financial and Performance Results | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 153 | Report Program Financial and Performance Results | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 154 | Perform Corrective Actions if Necessary | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 154 | Perform Corrective Actions if Necessary | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 154 | Perform Corrective Actions if Necessary | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 154 | Perform Corrective Actions if Necessary | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 155 | Forecast Program Budgets and Performance | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 155 | Forecast Program Budgets and Performance | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 155 | Forecast Program Budgets and Performance | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 156 | Maintain Budget Approvals | Exec. Steering Committee | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 156 | Maintain Budget Approvals | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 156 | Maintain Budget Approvals | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 156 | Maintain Budget Approvals | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 157 | Perform Contract Management | Third Party Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 157 | Perform Contract Management | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 157 | Perform Contract Management | Exec. Steering Committee | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 157 | Perform Contract Management | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 157 | Perform Contract Management | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 157 | Perform Contract Management | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 158 | Update the Repository | Repository Administrator | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 160 | Establish Quality Management Process | Keane Doc Specialist | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 160 | Establish Quality Management Process | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 160 | Establish Quality Management Process | Exec. Steering Committee | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 160 | Establish Quality Management Process | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 160 | Establish Quality Management Process | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 160 | Establish Quality Management Process | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 160 | Establish Quality Management Process | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 161 | Establish Quality Measures | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 161 | Establish Quality Measures | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 161 | Establish Quality Measures | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 161 | Establish Quality Measures | Keane Doc Specialist | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 161 | Establish Quality Measures | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 161 | Establish Quality Measures | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 162 | Perform Quality Assessments | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 162 | Perform Quality Assessments | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 162 | Perform Quality Assessments | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 162 | Perform Quality Assessments | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 163 | Identify Opportunities for Improvement | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 163 | Identify Opportunities for Improvement | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 163 | Identify Opportunities for Improvement | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 163 | Identify Opportunities for Improvement | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 164 | Perform Corrective Actions if Necessary | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 164 | Perform Corrective Actions if Necessary | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 164 | Perform Corrective Actions if Necessary | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 164 | Perform Corrective Actions if Necessary | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 165 | Track Performance on Quality Measurements | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 165 | Track Performance on Quality Measurements | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 165 | Track Performance on Quality Measurements | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 165 | Track Performance on Quality Measurements | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 166 | Report Quality Performance | Exec. Steering Committee | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 166 | Report Quality Performance | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 166 | Report Quality Performance | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 166 | Report Quality Performance | Third Party Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 166 | Report Quality Performance | Client Program Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 166 | Report Quality Performance | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 166 | Report Quality Performance | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 166 | Report Quality Performance | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 167 | Provide QA Training and Consulting | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 167 | Provide QA Training and Consulting | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 167 | Provide QA Training and Consulting | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 168 | Update Repository | Repository Administrator | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 170 | Consolidate Personnel Resource Requirements | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 170 | Consolidate Personnel Resource Requirements | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 170 | Consolidate Personnel Resource Requirements | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 171 | Optimize Deployment of Personnel | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 171 | Optimize Deployment of Personnel | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 172 | Manage Sourcing of Personnel Requirements | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 172 | Manage Sourcing of Personnel Requirements | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 173 | Forecast and Plan for Future Personnel Requirements | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 173 | Forecast and Plan for Future Personnel Requirements | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 174 | Manage Third Parties and Sub-Contractors | Third Party Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 174 | Manage Third Parties and Sub-Contractors | Client Program Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 174 | Manage Third Parties and Sub-Contractors | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 174 | Manage Third Parties and Sub-Contractors | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 174 | Manage Third Parties and Sub-Contractors | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 175 | Report on Personnel Utilization | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 175 | Report on Personnel Utilization | Client Program Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 175 | Report on Personnel Utilization | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 175 | Report on Personnel Utilization | Exec. Steering Committee | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 175 | Report on Personnel Utilization | Third Party Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 175 | Report on Personnel Utilization | Keane Doc Specialist | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 175 | Report on Personnel Utilization | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 176 | Oversee Training and Development | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 177 | Update Repository | Repository Administrator | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 179 | Develop Program Master Plan | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 179 | Develop Program Master Plan | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 179 | Develop Program Master Plan | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 179 | Develop Program Master Plan | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 179 | Develop Program Master Plan | Project Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 180 | Analyze Program Critical Path | Project Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 181 | Roll-Up Sub-Project Performance Results | Project Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 182 | Monitor Program Critical Path | Project Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 183 | Conduct Proactive Issue Management | Exec. Steering Committee | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 183 | Conduct Proactive Issue Management | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 183 | Conduct Proactive Issue Management | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 183 | Conduct Proactive Issue Management | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 183 | Conduct Proactive Issue Management | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 183 | Conduct Proactive Issue Management | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 183 | Conduct Proactive Issue Management | Project Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 184 | Manage Change | Project Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 184 | Manage Change | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 184 | Manage Change | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 184 | Manage Change | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 185 | Manage Risk | Project Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 185 | Manage Risk | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 185 | Manage Risk | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 185 | Manage Risk | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 186 | Manage Solutions Engineering | Practice Management Team | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 187 | Communicate Program Performance | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 187 | Communicate Program Performance | Keane Doc Specialist | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 187 | Communicate Program Performance | Third Party Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 187 | Communicate Program Performance | Exec. Steering Committee | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 187 | Communicate Program Performance | Client Program Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 187 | Communicate Program Performance | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 187 | Communicate Program Performance | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 188 | Update Program Master Plan | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 188 | Update Program Master Plan | Project Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 189 | Update Repository | Repository Administrator | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 191 | Consolidate Infrastructure Requirements | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 191 | Consolidate Infrastructure Requirements | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 191 | Consolidate Infrastructure Requirements | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 191 | Consolidate Infrastructure Requirements | Keane Doc Specialist | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 192 | Manage Facilities Infrastructure | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 192 | Manage Facilities Infrastructure | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 192 | Manage Facilities Infrastructure | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 193 | Manage Tool Infrastructure | Keane Doc Specialist | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 193 | Manage Tool Infrastructure | Repository Administrator | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 193 | Manage Tool Infrastructure | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 193 | Manage Tool Infrastructure | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 194 | Manage Best Practices Infrastructure | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 194 | Manage Best Practices Infrastructure | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 194 | Manage Best Practices Infrastructure | Keane Doc Specialist | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 194 | Manage Best Practices Infrastructure | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 194 | Manage Best Practices Infrastructure | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 195 | Research and Develop New Capabilities | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 195 | Research and Develop New Capabilities | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 195 | Research and Develop New Capabilities | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 195 | Research and Develop New Capabilities | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 196 | Deploy New Capabilities | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 196 | Deploy New Capabilities | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 196 | Deploy New Capabilities | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 196 | Deploy New Capabilities | Keane Doc Specialist | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 196 | Deploy New Capabilities | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 197 | Monitor Performance of New Capabilities | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 197 | Monitor Performance of New Capabilities | Exec. Steering Committee | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 197 | Monitor Performance of New Capabilities | Client Program Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 197 | Monitor Performance of New Capabilities | Third Party Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 197 | Monitor Performance of New Capabilities | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 197 | Monitor Performance of New Capabilities | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 197 | Monitor Performance of New Capabilities | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 197 | Monitor Performance of New Capabilities | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 198 | Perform Configuration Management | Repository Administrator | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 199 | Update Repository | Repository Administrator | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 201 | Participate in Enterprise Strategic Planning | Keane Doc Specialist | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 201 | Participate in Enterprise Strategic Planning | Client Program Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 201 | Participate in Enterprise Strategic Planning | Third Party Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 201 | Participate in Enterprise Strategic Planning | Exec. Steering Committee | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 201 | Participate in Enterprise Strategic Planning | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 201 | Participate in Enterprise Strategic Planning | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 201 | Participate in Enterprise Strategic Planning | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 201 | Participate in Enterprise Strategic Planning | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 201 | Participate in Enterprise Strategic Planning | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 202 | Drive Business Risk Assessments | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 202 | Drive Business Risk Assessments | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 202 | Drive Business Risk Assessments | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 202 | Drive Business Risk Assessments | Third Party Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 202 | Drive Business Risk Assessments | Client Program Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 202 | Drive Business Risk Assessments | Exec. Steering Committee | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 202 | Drive Business Risk Assessments | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 203 | Drive Project Risk Assessments | Exec. Steering Committee | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 203 | Drive Project Risk Assessments | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 203 | Drive Project Risk Assessments | Third Party Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 203 | Drive Project Risk Assessments | Client Program Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 203 | Drive Project Risk Assessments | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 203 | Drive Project Risk Assessments | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 203 | Drive Project Risk Assessments | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 204 | Develop Risk Mitigation Plans | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 204 | Develop Risk Mitigation Plans | Keane Doc Specialist | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 204 | Develop Risk Mitigation Plans | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 204 | Develop Risk Mitigation Plans | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 205 | Develop Contingency Plans | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 205 | Develop Contingency Plans | Keane Doc Specialist | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 205 | Develop Contingency Plans | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 205 | Develop Contingency Plans | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 205 | Develop Contingency Plans | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 206 | Drive Business Alignment Throughout PMO | Exec. Steering Committee | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 206 | Drive Business Alignment Throughout PMO | Client Program Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 206 | Drive Business Alignment Throughout PMO | Third Party Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 206 | Drive Business Alignment Throughout PMO | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 206 | Drive Business Alignment Throughout PMO | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 206 | Drive Business Alignment Throughout PMO | Keane Doc Specialist | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 206 | Drive Business Alignment Throughout PMO | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 206 | Drive Business Alignment Throughout PMO | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 206 | Drive Business Alignment Throughout PMO | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 208 | Review PMO Charter and Objectives | Third Party Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 208 | Review PMO Charter and Objectives | Client Program Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 208 | Review PMO Charter and Objectives | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 208 | Review PMO Charter and Objectives | Client Communications Spec. | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 208 | Review PMO Charter and Objectives | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 208 | Review PMO Charter and Objectives | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 208 | Review PMO Charter and Objectives | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 208 | Review PMO Charter and Objectives | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 208 | Review PMO Charter and Objectives | WWW Developer | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 208 | Review PMO Charter and Objectives | Keane Doc Specialist | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 209 | Develop Communications Strategy | Client Communications Spec. | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 209 | Develop Communications Strategy | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 209 | Develop Communications Strategy | WWW Developer | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 209 | Develop Communications Strategy | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 210 | Interview Stakeholders | Third Party Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 210 | Interview Stakeholders | Client Program Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 210 | Interview Stakeholders | Client Communications Spec. | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 211 | Develop Communications Plan | Client Communications Spec. | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 211 | Develop Communications Plan | WWW Developer | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 211 | Develop Communications Plan | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 211 | Develop Communications Plan | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 212 | Develop Budget for Communications Plan | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 212 | Develop Budget for Communications Plan | WWW Developer | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 212 | Develop Budget for Communications Plan | Client Communications Spec. | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 212 | Develop Budget for Communications Plan | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 213 | Obtain Approval for Plans | Third Party Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 213 | Obtain Approval for Plans | Client Program Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 213 | Obtain Approval for Plans | Exec. Steering Committee | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 213 | Obtain Approval for Plans | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 213 | Obtain Approval for Plans | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 213 | Obtain Approval for Plans | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 214 | Develop Communications Infrastructure | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 214 | Develop Communications Infrastructure | WWW Developer | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 214 | Develop Communications Infrastructure | Client Communications Spec. | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 214 | Develop Communications Infrastructure | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 214 | Develop Communications Infrastructure | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 214 | Develop Communications Infrastructure | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 215 | Execute the Communications Plan | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 215 | Execute the Communications Plan | WWW Developer | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 215 | Execute the Communications Plan | Client Communications Spec. | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 215 | Execute the Communications Plan | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 215 | Execute the Communications Plan | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 215 | Execute the Communications Plan | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 216 | Obtain and Analyze Feedback | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 216 | Obtain and Analyze Feedback | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 216 | Obtain and Analyze Feedback | WWW Developer | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 216 | Obtain and Analyze Feedback | Client Communications Spec. | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 216 | Obtain and Analyze Feedback | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 216 | Obtain and Analyze Feedback | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 217 | Improve the Communications Plan | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 217 | Improve the Communications Plan | WWW Developer | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 217 | Improve the Communications Plan | Client Communications Spec. | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 217 | Improve the Communications Plan | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 219 | Identfiy New Program Business Requirements | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 219 | Identfiy New Program Business Requirements | Keane Doc Specialist | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 219 | Identfiy New Program Business Requirements | Third Party Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 219 | Identfiy New Program Business Requirements | Client Program Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 219 | Identfiy New Program Business Requirements | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 219 | Identfiy New Program Business Requirements | Exec. Steering Committee | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 219 | Identfiy New Program Business Requirements | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 219 | Identfiy New Program Business Requirements | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 219 | Identfiy New Program Business Requirements | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 220 | Identify Program Performance Issues | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 220 | Identify Program Performance Issues | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 220 | Identify Program Performance Issues | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 220 | Identify Program Performance Issues | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 220 | Identify Program Performance Issues | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 221 | Analyze Existing PMO Charter and Structure | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 221 | Analyze Existing PMO Charter and Structure | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 221 | Analyze Existing PMO Charter and Structure | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 221 | Analyze Existing PMO Charter and Structure | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 222 | Identify Opportunities for Improvement | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 222 | Identify Opportunities for Improvement | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 222 | Identify Opportunities for Improvement | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 222 | Identify Opportunities for Improvement | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 223 | Recommend Program Improvements | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 223 | Recommend Program Improvements | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 223 | Recommend Program Improvements | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 223 | Recommend Program Improvements | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 224 | Gain Approval | Third Party Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 224 | Gain Approval | Client Program Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 224 | Gain Approval | Exec. Steering Committee | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 224 | Gain Approval | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 224 | Gain Approval | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 226 | Review Recommended Program Improvements | Client Program Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 226 | Review Recommended Program Improvements | Third Party Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 226 | Review Recommended Program Improvements | Exec. Steering Committee | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 226 | Review Recommended Program Improvements | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 226 | Review Recommended Program Improvements | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 226 | Review Recommended Program Improvements | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 226 | Review Recommended Program Improvements | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 226 | Review Recommended Program Improvements | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 227 | Develop Implementation Plan | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 227 | Develop Implementation Plan | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 228 | Establish Budget | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 228 | Establish Budget | Exec. Steering Committee | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 228 | Establish Budget | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 228 | Establish Budget | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 229 | Establish Roles and Responsibilities | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 229 | Establish Roles and Responsibilities | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 229 | Establish Roles and Responsibilities | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 229 | Establish Roles and Responsibilities | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 229 | Establish Roles and Responsibilities | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 230 | Execute Improvement Plan | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 230 | Execute Improvement Plan | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 230 | Execute Improvement Plan | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 230 | Execute Improvement Plan | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 230 | Execute Improvement Plan | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 231 | Conduct Post Implementation Review | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 231 | Conduct Post Implementation Review | Client Business Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 231 | Conduct Post Implementation Review | PMO Team Members | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 231 | Conduct Post Implementation Review | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 231 | Conduct Post Implementation Review | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 232 | Communicate Results | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 232 | Communicate Results | Third Party Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 232 | Communicate Results | Exec. Steering Committee | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 232 | Communicate Results | Client Program Stakeholders | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 232 | Communicate Results | Keane Doc Specialist | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 232 | Communicate Results | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 232 | Communicate Results | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 233 | Update Repository | Repository Administrator | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 236 | Establish the PM Environment | PMO Transition Team | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 236 | Establish the PM Environment | PMO Transition Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 236 | Establish the PM Environment | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 236 | Establish the PM Environment | Functional Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 236 | Establish the PM Environment | Project Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 236 | Establish the PM Environment | Client Sponsor | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 236 | Establish the PM Environment | Keane Doc Specialist | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 237 | Manage the Engagement | Program Manager | 0 hrs | Wed 6/17/98 | Wed 6/17/98 | 0% |
| 238 | Establish and Perform Quality Assurance Process | Keane QA Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 239 | Tools and Repository Management | Repository Administrator | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 241 | Understand the Transition Requirements | Third Party Stakeholders | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 241 | Understand the Transition Requirements | Client Program Stakeholders | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 241 | Understand the Transition Requirements | Exec. Steering Committee | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 241 | Understand the Transition Requirements | Client Business Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 241 | Understand the Transition Requirements | Keane Doc Specialist | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 241 | Understand the Transition Requirements | PMO Team Members | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 241 | Understand the Transition Requirements | Client Sponsor | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 241 | Understand the Transition Requirements | Functional Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 241 | Understand the Transition Requirements | Program Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 241 | Understand the Transition Requirements | PMO Transition Team | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 241 | Understand the Transition Requirements | PMO Transition Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 242 | Develop Transition Statement of Work | Functional Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 242 | Develop Transition Statement of Work | Keane Doc Specialist | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 242 | Develop Transition Statement of Work | Client Business Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 242 | Develop Transition Statement of Work | Program Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 242 | Develop Transition Statement of Work | PMO Transition Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 243 | Obtain Approval | Client Program Stakeholders | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 243 | Obtain Approval | Exec. Steering Committee | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 243 | Obtain Approval | Program Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 243 | Obtain Approval | Client Sponsor | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 243 | Obtain Approval | PMO Transition Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 245 | Execute the Transition Plan | Client Program Stakeholders | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 245 | Execute the Transition Plan | Third Party Stakeholders | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 245 | Execute the Transition Plan | Client Business Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 245 | Execute the Transition Plan | PMO Team Members | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 245 | Execute the Transition Plan | Exec. Steering Committee | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 245 | Execute the Transition Plan | Client Sponsor | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 245 | Execute the Transition Plan | Keane Doc Specialist | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 245 | Execute the Transition Plan | Functional Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 245 | Execute the Transition Plan | Program Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 245 | Execute the Transition Plan | PMO Transition Team | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 245 | Execute the Transition Plan | PMO Transition Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 246 | Hand-off Documentation | PMO Transition Team | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 246 | Hand-off Documentation | Functional Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 246 | Hand-off Documentation | PMO Team Members | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 246 | Hand-off Documentation | Keane Doc Specialist | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 247 | Conduct Debriefings | Client Business Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 247 | Conduct Debriefings | PMO Team Members | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 247 | Conduct Debriefings | Program Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 247 | Conduct Debriefings | Functional Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 247 | Conduct Debriefings | PMO Transition Team | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 247 | Conduct Debriefings | PMO Transition Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 248 | Conduct Training | PMO Transition Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 248 | Conduct Training | PMO Team Members | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 248 | Conduct Training | PMO Transition Team | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 249 | De-Install Hardware and Software | Repository Administrator | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 250 | Review Lessons Learned | Client Sponsor | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 250 | Review Lessons Learned | Client Business Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 250 | Review Lessons Learned | PMO Team Members | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 250 | Review Lessons Learned | Functional Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 250 | Review Lessons Learned | Program Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 250 | Review Lessons Learned | PMO Transition Team | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 250 | Review Lessons Learned | PMO Transition Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 251 | Remove Proprietary Materials | Program Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 252 | Notify Security | PMO Transition Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 252 | Notify Security | Functional Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 252 | Notify Security | Program Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 254 | Execute Follow-On Support | Third Party Stakeholders | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 254 | Execute Follow-On Support | Client Business Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 254 | Execute Follow-On Support | Keane Doc Specialist | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 254 | Execute Follow-On Support | Client Program Stakeholders | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 254 | Execute Follow-On Support | PMO Team Members | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 254 | Execute Follow-On Support | Exec. Steering Committee | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 254 | Execute Follow-On Support | Client Sponsor | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 254 | Execute Follow-On Support | Functional Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 254 | Execute Follow-On Support | Program Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 254 | Execute Follow-On Support | PMO Transition Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 254 | Execute Follow-On Support | PMO Transition Team | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 255 | Obtain Sign-offs | Third Party Stakeholders | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 255 | Obtain Sign-offs | Client Business Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 255 | Obtain Sign-offs | Client Program Stakeholders | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 255 | Obtain Sign-offs | Keane Doc Specialist | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 255 | Obtain Sign-offs | PMO Team Members | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 255 | Obtain Sign-offs | Exec. Steering Committee | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 255 | Obtain Sign-offs | Client Sponsor | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 255 | Obtain Sign-offs | Functional Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 255 | Obtain Sign-offs | Program Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 255 | Obtain Sign-offs | PMO Transition Manager | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |
| 255 | Obtain Sign-offs | PMO Transition Team | 0 hrs | Tue 6/16/98 | Tue 6/16/98 | 0% |